King Road at Bell Avenue - Traffic Signal Repair
Project Description: This project will repair damage done by an uninsured driver. The signal indications for the westbound direction has been temporarily mounted on a wooden utility pole until repairs can be made. In addition to the signal repair, improvements to the northwest corner sidewalk and ADA ramps will be made. Also, new traffic signal controller, pedestrian countdown signal heads and Flashing Yellow Left Turn Arrow signal heads will be installed.
Updated: 05/01/13
Status: In Design
Schedule: Construction is likely to start in summer of 2014.
Contact: Bikram Raghubansh, Design Engineer/Project Manager: 503-742-4706 or BikramRag@clackamas.us
Things to be aware of:
- There are no closures or detours anticipated as a result of this project.
Current Activities:
- Preliminary design and right-of-way
Funding:
- Current engineer’s estimate is $155,800
Project Exhibits: Click on the image below to see a larger version.