Tolbert Street: 82nd Dr to Minuteman Way - Bridge Project

Project Description: This project is extending and improving Tolbert Street from 82nd Drive to Minuteman Way by adding a traffic signal to the existing intersection of Tolbert St and 82nd Dr, a new bridge over the Union Pacific Railroad mainline tracks, a new intersection at Minuteman Way and the Camp Withycombe main gate, bikelanes and sidewalks. The new bridge is replacing the existing at-grade crossing at Lawnfield Road making travel safer for both vehicles and pedestrians.  This project also includes the reconstruction of 93rd Ave and 94th Ave from Tolbert St south to Clackamas Rd and Church St from 82nd Dr to 94th Ave. This additional work includes new road base, asphalt, curbs, storm water drainage and sidewalks.

Updated: 10/1/16

Status: In construction

Schedule:

Contact: Terry Mungenast, Project Manager: 503-742-4656

Consultant: Harper Houf Peterson Righellis Inc.

Contractor: Cascade Bridge, LLC

Things to be aware of:

Current Activities:

Funding:

You may be interested to know:

Project Exhibits: Click on the image below to see a larger version.

 Tolbert Street Bridge plan
Tolbert Street Bridge Plan

Share this page

Development Services Building

Contact Us

Transportation Engineering
150 Beavercreek Road
Oregon City, OR 97045

503-742-4691

Lobby:
M-TH: 8 a.m. to 4 p.m.
F: 8 a.m. to 3 p.m.

Report a Road Concern