File # Z0117-21-C CONDITIONAL USE

Join this meeting with Zoom

Connect using the following Zoom Join Code: 852 1046 0783

Join by telephone:

  • 408-638-0968
  • 669-900-6833
  • 346-248-7799
  • 253-215-8782
  • 301-715-8592
  • 312-626-6799
  • 646-876-9923

Webinar ID: 852 1046 0783

Learn more about Zoom

Applicant: City of Portland-Portland Water Bureau

Property owner: Portland Water Bureau

Proposal: Master Plan for a maintenance and operations facility for the Portland Water Bureau; The plan proposes to relocate the  current facilities operations from Sandy River Station, on Lusted Rd near Dodge Park, to a new location at the intersection of Bull Run Rd and Waterworks Rd. AS operations are phased out of the Sandy River Station facility, they will be relocated to the new facility. The new facility will require the same number of staff and vehicle trips as the existing Sandy River Station. Purpose of the master plan approach here is to allow the proposed facility to be constructed over a relatively long period of time. Site is approximately 136-acres in size, located along easterly side of SE Ten Eyck Road and northerly of SE Bull Run Road, Bull Run area. Zone designation is TBR, Timber.

Applicable zoning and development ordinance criteria: Section 406, 704, 1005, 1006, 1007, 1009, 1010, 1015, 1021 and 1203 of the Clackamas County Zoning and Development Ordinance These criteria may be viewed online.

Site address and/or location: Easterly side of SE Ten Eyck Road and northerly of SE Bull Run Road, Bull Run area 42220 SE Waterworks Road;

Assessor’s map: T2S, R5E, Section 06, Tax Lot(s) 00104 , W.M.

Property Size: 133.55 acres

Zoning: TBR-Timber