You searched for
Search Results
for Search Term
-
Planning and Zoning
Home occupation for the purpose of hosting events, year round, on 53.12 acre property. The property currently contains a manufactured home, several accessory structures, and approximately 20 acres of vineyard. The development proposal includes the construction of two-story venue building with a main floor area of 11,532 square feet, a gravel parking area including 76 spaces, a garbage enclosure, and other associated improvements. The proposed event venue would take access from an existing driveway to S. New Era Road.
GO TO PAGE -
Board of County Commissioners
In-Person at the BCC Hearing Room and via virtual technology
GO TO PAGE -
Board of County Commissioners
In-Person at the BCC Hearing Room and via virtual technology
GO TO PAGE -
Planning and Zoning
The Planner Director decision has been appealed.
GO TO PAGE
The applicant is requesting an alteration of a previous NCU approved on the subject property. The site was previously used concurrently as a metal fabrication business and car, motorcycle, truck, and farm/industrial equipment repair shop. The applicant is requesting approval for an asphalt cutting and coring business. The site will serve as a primary base of operations for the business, with primary work functions occurring off-site. Clients will not be visiting the site, and the applicant will be primarily storing materials, including work trucks, and preparing materials for off-site jobs. Planning Director’s Initial Decision: Approval, with Conditions -
Planning and Zoning
Conditional Use for the placement of two modular buildings on tax lot 00701 to be used as four Kindergarten through Grade 5 classrooms and associated site improvements including landscaping, walkways, a fire access turn around, and stormwater mitigation.
GO TO PAGE -
Planning and Zoning
The hearing for this land use application is postponed to a future date. Notification will be provided when a new hearing date has been scheduled.
GO TO PAGE -
Planning and Zoning
To construct a 12-acre photovoltaic solar power generation facility with solar panels, racking, invertors, overhead poles and lines, and perimeter fencing.
GO TO PAGE
Translate


