El Camino Way Stormwater Improvements

Status

Construction

Updated: April 30, 2026

Increasing stormwater capacity to reduce flooding and improve maintenance access

Flooding on El Camino Way, El Centro Way, El Centro Ct and La Mesa Way roads in the Oak Grove area occurs periodically. To reduce the frequency of flooding and to provide stormwater infrastructure with capacity for a 10-year storm event, we will replace the existing stormwater pipes. Currently, most of the stormwater pipes exist on private property and most of the pipes will be moved to existing roads within the public right of way. Constructing the storm pipes within the right of way will be easier to maintain.

Why

To decrease the frequency of flooding, improve maintenance access, and to comply with Oak Lodge Water District and Clackamas County standards requiring stormwater collection systems to provide for a 10-year storm event for this size of drainage basin.

Schedule

  • Design: Feb. 2023 to April 2024
  • Right of way: Dec. 2023 to April 2024
  • Construction: May 2026 to August 2026

Traffic impact

  • Expect shoulder and lane closures and detours with delays up to 20 minutes during construction.
  • Construction is expected to be completed within two weeks. Remaining work includes installing remaining pipe and trench patching.

Funding

  • Project estimate $1.4 million
  • Funding is provided from American Rescue Plan Act (ARPA) funds.

Contact 

Mike Oleson

Project Manager

503-742-4698

MichaelOle@clackamas.us

Phone:503-742-4691
Email:engineering@clackamas.us

150 Beavercreek Road Room #325 Oregon City, OR 97045

Office Hours:

Monday to Thursday
8 a.m. to 4 p.m.

Available by phone/email
Friday
8 a.m. to 3 p.m.

Related Events
Budget, Transportation Engineering
-