WES is investing in our infrastructure to provide resilient, reliable sanitary sewer service to protect the environment and serve your community. We will be upgrading electrical equipment, automatic controls, on site power generation and pumps at the facilities below. The pump stations are a vital part of our infrastructure that needs to be operational 24 hours a day 365 days a year pumping sanitary sewage safely on through the collection system to our water resource recovery facilities for treatment.
Pump station upgrades and repairs
Name | Location | Estimated construction timeframe |
---|---|---|
Bolton | 6597 N. E. Failing Street, West Linn | Fall 2022 - Spring 2023 |
River Street | 5770 River Street, West Linn | Spring and Summer 2023 |
Timberline Rim | 64401 E Brightwood Loop Road, Brightwood | Summer 2023 |
Clackamas | 16561 Southeast Evelynn Street, Clackamas County | Spring and Summer 2023 |
Sieben Lane | 14149 SE 142nd Avenue, Clackamas County | Fall 2023 thru Spring 2024 |
Gladstone | 391 West Clackamas Boulevard, Gladstone | Fall 2023 thru Spring 2024 |
82nd Drive | I205 off ramp and 82nd drive, Gladstone | Spring 2024 thru Winter 2024 |
Golf Club Terrace | East Highland Drive, Welches | Spring 2024 thru Winter 2024 |
South Welches | Mt. Hood Resort golf course, Welches | Spring 2024 thru Winter 2024 |