DTD - Engineering - Development Permits1,2
| Fee Description | Fee Amount |
|---|
| Commercial, Multifamily, & Industrial (includes apartments & condominiums); Permit and Inspection | $2,572 min. or 8.83% of public improvements & 5% of onsite transportation improvements |
| Structured Parking: (Fee calculated using the average number of spaces per level, not total spaces in garage) | $128 per number of spaces/level or min. fee whichever is greater |
| | $2,572 Min. fee |
| Residential subdivision/partition/non-land use related permit & inspection | $2,572 min. or 8.83% of public and private road improvements, whichever is greater. |
| Non DTD public agency work (capital projects) in existing road right-of-way | Actual cost; deposit based upon County estimate |
| Development permit time extension | $422 |
| Erosion Control Review - Residential | $310 |
| Erosion Control Review- Commercial | $460 Up to one acre |
| Erosion Control Inspection Fee | $126 Up to one acre |
| Plan Review (beyond three reviews) | Actual Cost. |
| Reinspection | Actual Cost. |
| | |
DTD - Engineering - Entrance Permits1,2
| Fee Description | Fee Amount |
|---|
| Existing entrance; surface, resurface, minor upgrade and/or extend exiting driveway | $316 |
| New entrance; permit & inspection, subdivision w/in UGB | $264 |
| New entrance; permit & inspection | $565 |
| Time Extension | $158 |
| | |
DTD - Engineering - Right-of-Way Permits1,2
| Fee Description | Fee Amount |
|---|
| Road right-of-way improvements (not requiring a development permit) | |
| Ditches, culverts, or drainage, minor surfacing (under 5000 sf) or other minor work | $411 |
| Non-maintained local access road paving (5000 sf or more) | $528 |
| Work in the right-of-way; work completed by DTD, DTD contractors or railroads | No charge. |
| Design Modification Review Type 1 | $528 |
| Design Modification Review Type 2 | $422 |
| Gates on public roads: preliminary feasibility study | $264 |
| Gates on public roads: review and permitting | Actual costs (50% deposit of estimated costs) |
| Road Vacation - Preliminary feasibility study | $264 |
| Road Vacation | Actual costs (50% deposit of estimated costs) |
| Bike, run, walk, parade and race event w/ traffic control review | $316 |
| Filming with traffic control review | $158 |
| Revocable Encroachment (Individual) | $793 |
| Revocable Encroachment (Entity) | $1,057 |
| Temporary Road Closures | $617 |
| Traffic control plan review (if not associated with another Engineering permit) | $316 |
| Traffic impact study scoping & review | $514 |
| Guide & Tourist-Oriented Directional sign: | |
| Installation | $528 / each |
| Replacement/reinstallation | $316 / each |
| Hamlet or Village Sign: | |
| Manufacture/installation/repair/replacement | Actual cost |
| Time Extension | $158 |
DTD - Engineering - Other Fees1,2
| Fee Description | Fee Amount |
|---|
| ADA Exception Review per Permit | $898 |
| Fee in lieu of (sidewalks) | Actual construction costs (based on engineer or county estimate) |
| Refund, permit application withdrawn | $210 Application or appeal fee refunded, less this fee. |
| Reimbursement District Application (Zone of Benefit) | Actual costs/$10,000 deposit |
| Surface Water Plan Review | $750 |
| Time Extension | $158 |
| | |
DTD - Administration
| Fee Description | Fee Amount |
|---|
| Technology Fee1 | 3% of permit fee; maximum $5/permit |
| Total Receipt Adjustment -- to the nearest nickel. [Applies to all DTD Division receipts.]2 | Round total fees due UP or DOWN to the nearest nickel after compiling all calculated fees due on that receipt/payment. |
| Research/Consultation fee | $126 / hour - 1 hour minimum |
| Returned check fee | $26 |
1Technology fee of 3% of the base fee will apply to DTD - Engineering applications, up to a maximum of $5 per PERMIT.
2Total Receipt Adjustment will round total fees due UP or DOWN to the nearest nickel after compiling all calculated fees due on that receipt/payment.