Engineering Division Fees

DTD - Engineering - Development Permits1,2

Fee DescriptionFee Amount
Commercial, Multifamily, & Industrial (includes apartments & condominiums); Permit and Inspection $2,572 min. or 8.83% of public improvements & 5% of onsite transportation improvements 
Structured Parking: (Fee calculated using the average number of spaces per level, not total spaces in garage) $128 per number of spaces/level or min. fee whichever is greater 
  $2,572 Min. fee 
Residential subdivision/partition/non-land use related permit & inspection $2,572 min. or 8.83% of public and private road improvements, whichever is greater.  
Non DTD public agency work (capital projects) in existing road right-of-way Actual cost; deposit based upon County estimate 
Development permit time extension $422  
Erosion Control Review - Residential $310  
Erosion Control Review- Commercial $460 Up to one acre 
Erosion Control Inspection Fee $126 Up to one acre 
Plan Review (beyond three reviews) Actual Cost. 
Reinspection Actual Cost. 
  

DTD - Engineering - Entrance Permits1,2

Fee DescriptionFee Amount
Existing entrance; surface, resurface, minor upgrade and/or extend exiting driveway $316  
New entrance; permit & inspection, subdivision w/in UGB $264  
New entrance; permit & inspection $565  
Time Extension  $158  
  

DTD - Engineering - Right-of-Way Permits1,2

Fee DescriptionFee Amount
Road right-of-way improvements (not requiring a development permit) 
Ditches, culverts, or drainage, minor surfacing (under 5000 sf) or other minor work  $411  
Non-maintained local access road paving (5000 sf or more) $528  
Work in the right-of-way; work completed by DTD, DTD contractors or railroads No charge. 
Design Modification Review Type 1  $528  
Design Modification Review Type 2 $422  
Gates on public roads: preliminary feasibility study $264  
Gates on public roads: review and permitting Actual costs (50% deposit of estimated costs) 
Road Vacation - Preliminary feasibility study $264  
Road Vacation Actual costs (50% deposit of estimated costs) 
Bike, run, walk, parade and race event w/ traffic control review $316  
Filming with traffic control review $158  
Revocable Encroachment (Individual) $793  
Revocable Encroachment (Entity) $1,057  
Temporary Road Closures $617  
Traffic control plan review (if not associated with another Engineering permit) $316  
Traffic impact study scoping & review $514  
Guide & Tourist-Oriented Directional sign: 
Installation $528 / each 
Replacement/reinstallation $316 / each 
Hamlet or Village Sign: 
Manufacture/installation/repair/replacement Actual cost 
Time Extension  $158  

DTD - Engineering - Other Fees1,2

Fee DescriptionFee Amount
ADA Exception Review per Permit $898  
Fee in lieu of (sidewalks) Actual construction costs (based on engineer or county estimate) 
Refund, permit application withdrawn $210 Application or appeal fee refunded, less this fee. 
Reimbursement District Application (Zone of Benefit) Actual costs/$10,000 deposit 
Surface Water Plan Review  $750  
Time Extension  $158  
  

DTD - Administration

Fee DescriptionFee Amount
Technology Fee1 3% of permit fee; maximum $5/permit 
Total Receipt Adjustment -- to the nearest nickel.  [Applies to all DTD Division receipts.]2 Round total fees due UP or DOWN to the nearest nickel after compiling all calculated fees due on that receipt/payment. 
Research/Consultation fee $126 / hour - 1 hour minimum 
Returned check fee $26  

1Technology fee of 3% of the base fee will apply to DTD - Engineering applications, up to a maximum of $5 per PERMIT.
2Total Receipt Adjustment will round total fees due UP or DOWN to the nearest nickel after compiling all calculated fees due on that receipt/payment.

Phone:503-742-4400

150 Beavercreek Road Room #225 Oregon City, OR 97045

Office Hours:

Monday to Thursday
8 a.m. to 4 p.m.

Available by phone/email
Friday
8 a.m. to 3 p.m.

Related Events
Transportation and Development
-