Located three miles southeast of the community of Molalla, Feyrer Park is a relaxing riverside destination and a base camp for exploring the stunning Molalla River Corridor.
Feyrer Park Community improvements project Make a reservation
![]()
Day use
- Parking fee: $9
- Vehicles towing Oregon registered boats: $2
- Reservable picnic areas:
- 3 sheltered: $155–215
- 3 non-sheltered: $65–115
- 1 event area (50'x 70'): $220
- Reservable softball field and volleyball courts: 20
- Horseshoe pits are first come, first served. horseshoe rentals available: 5
![]()
Camping
- 112 campsites; 103 with water and electric hookups
- Water/electric hook-up sites:
- OR resident: $41/night
- Non-OR resident: $51/night
- Primitive, non-utility sites, portable toilet nearby: $25/night
- Standard, non-utility sites, restrooms nearby: $31/night
- Group tent: $90/night
- Bunkhouse: $45/night
- Hammock: $20/night
- Additional vehicle fee: $9/night

RV dump
Non-camping RV dump station: $25
![]()
Boating
1 boat ramp
![]()
Fishing
Clackamas River
![]()
Hiking trails
1.5 miles of trails
![]()
Hours
- Spring (March 1 - April 30): 6 a.m. to 8 p.m.
- Summer (May 1 - Sept. 30):
- Day Use: 6 a.m. to 9 p.m.
- Campground: 6 a.m. to 10 p.m.
- Fall (Oct. 1 - Oct. 31): 6 a.m. to 8 p.m.
- Winter (Nov. 1 - Feb. 28): 6 a.m. to 6 p.m.
Directions
16185 S. Feyrer Park Road, Molalla
- Ranger Office: 503-829-6621
- Information and reservations: 503-742-4414
More info
Campground map
Feyrer Park Community Improvements Project
Fall 2024
After Feyrer Park camping ends for the season on Sept. 16, 2024, construction of improvements requested by the community will begin, including:
- Construct an amphitheater with seating for mini-concerts, presentations, theater and other community events.
- Update and upgrade walking paths, parking stalls, crosswalk ramps and signs to provide easier access for people of all abilities.
- Install new playground features to offer fun opportunities for children of all abilities to safely enjoy playground areas.
- Improve roadways throughout the park, including paving, extended parking stalls, new curbs and accessible walkways to park amenities to improve traffic flow and safety.
These improvements are happening in response to what we heard from the community during recent outreach activities (PDF). We heard that top community priorities include:
- Traffic and parking
- Safety
- Accessibility for all residents

Translate



