County Roads Take Me Home stickerProjects funded through the new Community Road Fund will increase safety, relieve congestion and maintain local roads.

Installed a special radar detection system to detect vehicles as they approach the intersection. The detection prevents the signal from changing to another direction prematurely and placing drivers in a dilemma of deciding to go through the intersection or not, causing longer wait times. Added reflective material to traffic signal heads to increase visibility. 

Status
Completed

Updated: Oct. 5, 2022

Why

To improve safety and reduce crashes.

Schedule

  • Design: June 2020 - July 2021
  • Construction: July 2021- June 2022

Funding

  • Project estimate $84,000 