Planning phase
Updated: Nov. 15, 2023
Reducing rear-end crashes by improving visibility of intersection
Most crashes at this intersection are rear-end collisions. Includes installing a radar detection system to detect vehicles as they approach the Knights Bridge Road/Arndt Road intersection. The detection prevents the signal from changing to another direction prematurely and placing drivers in a dilemma of deciding to go through the intersection or not, causing longer wait times. Also adding signal ahead signs and pavement markings to alert drivers of changing conditions.
Why
To provide a safer roadway for all users by increasing visibility of intersection.
Schedule
- Design: Summer 2023 - Winter 2023
- Right of way: Winter 2022 - Spring 2023
- Construction: Fall 2024 - Summer 2025
Traffic impact
Traffic impacts will be minor during installation.
Current activities
Project planning.
Funding
- Project estimate $325,000.
- Funding is provided from HB2017 state gas taxes.