Radar Speed Sign Installation Project

Six radar speed feedback signs will be added to reduce the speed of travelers on Stafford Road, New Era Road and SE 282nd Ave. 

Status

Project in design phase

Updated: April 1, 2021

Radar signs will be installed at the following locations:

  • SW Stafford Road 
    • Northbound: south of SW Schatz Road
    • Southbound: south of Mountain Road
  • S New Era Road
    • Eastbound: west of S Central Point Road
    • Westbound: east Central Point Road 
  • SE 282nd Ave
    • Northbound: north of OR 212
    • Southbound: north of OR 212

Why

To provide a safer roadway for all users by reducing vehicle speeds.

Schedule

The county began the design phase in April 2020. Installation of safety signs to start in spring 2023. The project is expected to be complete by June 2023.

Traffic impacts

Minor and intermittent lane closures for sign installation may be needed.

Current activities

  • Murraysmith, Inc., an engineering consultant, is developing final project plans.

Funding

  • Project estimate $294,000.
  • Funding is provided from the county road fund.

Phone:503-742-4691
Email:engineering@clackamas.us

150 Beavercreek Road Room #325 Oregon City, OR 97045

Office Hours:

Monday to Thursday
8 a.m. to 4 p.m.

Available by phone/email
Friday
8 a.m. to 3 p.m.

Related Events
Transportation Engineering
-
Transportation Engineering
-
Related News
Transportation and Development, Damascus Roads, Transportation Engineering