Design phase
Updated: March 15, 2023
Improving safety by reducing the speed of travelers
Four radar speed feedback signs will be installed on Beavercreek Road and Barlow Road near the Oregon City and Canby areas. Radar signs will be installed for northbound and southbound traffic on both roads. Locations will be determined during the engineering design phase.
Why
To provide a safer roadway for all users by reducing vehicle speeds.
Schedule
- Design: Summer 2023 to Winter 2023
- Construction: Spring 2024 to Winter 2024
Traffic impact
Expect shoulder and lane closures with delays up to 20 minutes during construction.
Current activities
Project planning.
Funding
- Project estimate $370,000.
- Funding is provided from Community Road Funds.