Construction coordination
Updated: July 22, 2026
Replace traffic signal, widen intersection, add lighting, update pedestrian access to meet ADA standards, and upgrade signal with radar detection system. The detection prevents the signal from changing to another direction prematurely and placing drivers in a dilemma of deciding to go through the intersection or not, causing longer wait times.
Why
To improve safety and reduce crashes at the intersection.
Schedule
- Design: Fall 2023-Spring 2024
- Right of way: Winter 2024 to Summer 2024
- Construction: Fall 2026 - Summer 2027
Funding
- Project estimate $2.6 million
- Funding is provided from the Community Road Fund and transportation system development charges