Agriculture

145161

Yes, and No.

Yes: If the agricultural building is used primarily for a commercial farm or business and will have equipment and processing of agricultural products or hazardous conditions as defined in the Oregon Electrical Specialty Code (OESC) Article 547, a plan review will be required.

No: If the agricultural building is primarily used for light hobby agricultural uses in association with a residential structure and the service is less than 400 amps, a plan review will not be required. (Note: Tamper resistant receptacles will be required in buildings used for light hobby agricultural purposes)

(The building official will make a final determination regarding the use of the structure and plan review requirements)

Statutory Reference

OAR 918-311-0010 describes the plan review rules authorized by ORS 479.870 which requires mandatory electrical plan review in connection with a permit for the construction, alteration, or repair of electrical installations when it goes beyond the threshold standards set in OAR 918-311-0040 which states (1) A jurisdiction providing electrical code plan review services may only require electrical plan review for complex structure. The following list describes what makes a complex structure.

(1) A jurisdiction providing electrical code plan review services may only require electrical plan review for a complex structure. For the purpose of this rule, "complex structures" have an electrical system designed, constructed or reconstructed with any of the following:

(a) A service or feeder beginning at 400 Amps where the available fault current exceeds 10,000 Amps at 150 Volts or less to ground or exceeds 14,000 Amps for all other installations; or

(b) Installation of a 150 KVA or larger separately derived system as defined in Article 100 of the National Electrical Code (NEC); or

(c) Addition of a new motor load of 100 HP or more; or

(d) Fire pump installations as defined in Article 695 of the NEC; or

(e) Emergency systems installations as defined in Article 700 of the NEC; or

(f) A service or feeder rated at 600 Amps or over; or

(g) Voltage. More than 600 supply volts nominal; or

(h) Renewable Energy. Renewable electrical energy systems rated over 25 KVA; or

(i) Height. More than three stories; or

(j) Occupancy.

(A) Six or more residential units in one structure; or

(B) An "A" (Assembly) occupancy, "E" (Educational) occupancy, or "I-2" or "I-3" (Institutional) occupancy as defined in the adopted Oregon Structural Specialty Code; or

(C) Any of the following special occupancies as described in Chapter 5 of the NEC adopted by the board in OAR 918-305-0100 (Adoption of Oregon Electrical Specialty Code):

(i) Hazardous (Classified) locations as defined in Articles 500 to 516; or

(ii) Installations in patient care areas of health care facilities as defined in Article 517; or

(iii) Agricultural buildings used for commercial purposes, as defined in Article 547; or

(iv) Floating buildings as defined in Article 553; or

(v) Marinas and boat yards as defined in Article 555; or

(k) Recreational Vehicle Park. A new recreational vehicle park, or any addition or alteration to an existing park.

(2) Plan review is not required for work permitted through minor installation labels under OAR 918-309-0210 (Use of Minor Labels) to 918-309-0260 (Misuse of Minor Installation Labels).

(3) A jurisdiction requiring electrical plan review may not require plan review on more than one building or structure under construction or reconstruction at the same job site, as long as:

(a) The electrical systems of the buildings or structures are materially alike, and;

(b) A person obtains electrical permits for the buildings or structures within a reasonable time.

(4) Standardized Format for Plan Review. When electrical plan review is required the electrical plan shall meet the following requirements:

(a) Copies. Submit two sets of electrical plans;

(b) Readability. The plans shall be drawn to scale, contain definitions for legends used, be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the applicable electrical code requirements, laws, ordinances, rules and regulations;

(c) Contents. The plans shall contain the following minimum requirements:

(A) Feeder riser diagram showing panel location and circuit schedules;

(B) One line riser diagram showing bonding and grounding and conductor sizes;

(C) Available fault current on the line side of service disconnect;

(D) Complete load calculations, or provide applicable load records, for all new installations and for additions to existing installations;

(E) Fixture schedule, showing type, location and layout of the fixtures;

(F) Address of the installation and name of owner and address;

(G) Identification of the employer, identification and signature of person who prepared the plan, license number if the person is an electrical supervisor and professional registration number if the person is an architect or registered professional electrical engineer; and

(H) Location of emergency systems, identifying the power source and the system on plan.

(5) Nothing in these rules shall prohibit a jurisdiction from requiring a lighting energy budget.

(6) Nothing in these rules shall prohibit the owner or the owner's agent from requesting and receiving plan review for non-complex structures.[Publications: Publications referenced are available from the agency.]

145161

Building and Mechanical

Electrical

Financial/General

Grading

Manufactured Dwellings

Plumbing

Phone:503-742-4240
Fax:503-742-4741
Email:bldservice@clackamas.us

150 Beavercreek Road Oregon City, OR 97045

Office Hours:

Monday to Thursday 
8 a.m. to 4 p.m.

Holiday hours